Cell Tower Site Stabilization Project – Pike County

ABOUT THIS PROJECT


Jigsaw Enterprises has been contracted to provide site stabilization and access road reconstruction for a cell tower site.  An MSE retaining wall was utilized to provide stability of the project area.  Also included in the project are site drainage control and safety wall installation to protect equipment at the site.

PROJECT ELEMENTS


  • Slope Stabilization
  • MSE Retaining Wall
  • Mass Excavation
  • Site Clearing
  • Pile and Lagging Retaining Wall
  • Erosion and Sediment Control
  • Impact Breaking Rock Excavation
  • Storm Drainage
  • Sub Drain
  • Hydro-seeding